Skip to content
English
  • There are no suggestions because the search field is empty.

Load Consolidation

Use Load Consolidation to combine compatible LTL and partial shipments into optimized manifests. Consolidating shipments can help improve trailer utilization, reduce loaded miles, lower transportation costs, and create more efficient routes. The same consolidation workflow works for both LTL and partial shipments, despite the fact they have slightly different engine modes.

 

Load Consolidation is not a base optimization model. If you feel your organization needs load consolidation, please contact your Customer Success Manager.

 


Key Use Cases

  • Consolidate LTL loads into manifests through origin and destination sort locations
  • Combine partial loads into one multi-stop truckload
  • Cap manifest size by trailer capacity, number of loads, legs and days
  • Limit circuitous routing and long waits at stops
  • Control how the engine scores candidate manifests with a cost per mile

Navigation Overview

Open Engine > Engine Mode in the left menu. In the middle panel, select a mode under LTL Consolidation or Partial Consolidation to view its parameters on the right. Choose Edit to change them.


Consolidation Mode Types

LTL Consolidation groups LTL loads into a manifest using origin and destination sort locations. It builds consolidation, line-haul and deconsolidation manifests, with line-haul legs and implied first- and final-mile distribution.

Partial Consolidation is modeled as trailer consolidation. It combines 2–5 partial loads into one multi-stop truckload, with soft limits on commodity, region and stop count.


Mode Management

  • Create a new mode: select +, choose LTL Consolidation or Partial Consolidation, and optionally copy parameters from an existing mode
  • Edit: open a mode and select Edit
  • Duplicate or delete: use the ⋮ menu beside the mode

Engine Mode Parameters

Example values are the ones shown in the default modes. Some parameters apply to both algorithms; Partial has additional parameters for combining loads.

Name

LTL

Partial

Trailer Capacity Limits

Yes

Yes

Default Load Capacity

Yes

Yes

Maximum Days per Manifest

Yes

Yes

Maximum Wait Time at Stops

Yes

Yes

Enable Load Count Limit per Manifest

Yes

Yes

Maximum Legs per Manifest

Yes

Yes

Enable Circuitry Limit for Manifest

Yes

Yes

Maximum Circuitry Limit Ratio

Yes

Yes

Cost per Mile

Yes

Yes

Adhere to Location Operating Hours

Yes

Yes

Use Cubic Feet for Volume

Yes

Yes

Maximize Consolidated Loads

No

Yes

Maximum Partial Loads per Manifest

No

Yes

Enable Partial Load's Stop Count Limit per Manifest

No

Yes

Minimum Distance Savings for Load Combination

No

Yes

Maximum Distance Ratio for Load Combination

No

Yes

Pickup & Delivery Proximity

No

Yes

LTL Consolidation

Name

Description

Example Values

Trailer Capacity Limits

Max allowable capacity of a trailer in terms of weight, volume, and pallets.

45,000 lbs, 3,000 ft³, 31 pallets

Default Load Capacity

Fallback capacity for loads when trailer-specific data is unavailable.

15,000 lbs, 1,000 ft³, 10 pallets

Maximum Days per Manifest

Maximum duration (in days) allowed to complete all stops in a manifest.

5 days

Maximum Wait Time at Stops

Max time a driver can dwell at a stop while waiting for service.

24 hours

Enable Load Count Limit per Manifest

Enables a hard cap on number of loads in a manifest.

No

Maximum Legs per Manifest

Max number of distinct stops (legs) allowed per manifest.

3

Enable Circuitry Limit for Manifest

Enforces a ratio of total mileage to straight-line distance.

Yes

Maximum Circuitry Limit Ratio

Max ratio of manifest mileage to straight-line mileage.

1.6

Cost per Mile

The cost used by the optimization engine per mile when scoring solutions.

$3 / mile

Adhere to Location Operating Hours

Whether to honor site hours for pickups/deliveries.

No

Use Cubic Feet for Volume

If true, volume is evaluated in cubic feet (vs. pallet count).

Yes

Partial Consolidation

Name

Description

Example Values

Trailer Capacity Limits

Maximum trailer capacity for weight, volume, and pallets.

45,000 lbs, 3,000 ft³, 31 pallets

Default Load Capacity

Default fallback when trailer-specific capacity is not available.

15,000 lbs, 1,000 ft³, 10 pallets

Maximum Days per Manifest

Maximum duration (in days) for completing the full manifest.

5 days

Maximize Consolidated Loads

Prioritizes load count in a manifest over minimizing cost.

No

Maximum Partial Loads per Manifest

Maximum partial loads allowed in a single manifest (excludes first/last shipper limits).

3

Enable Partial Load's Stop Count Limit per Manifest

Enables a limit on the number of distinct stops.

No

Maximum Wait Time at Stops

Maximum dwell time at any stop in the trip.

24 hours

Enable Load Count Limit per Manifest

Enables a max number of loads allowed in one manifest.

No

Maximum Legs per Manifest

Maximum number of stops/legs per manifest.

3

Minimum Distance Savings for Load Combination

Minimum route savings (in miles) needed to justify consolidation.

100 miles

Maximum Distance Ratio for Load Combination

Max ratio of consolidated mileage to direct mileage.

0.9

Pickup & Delivery Proximity

Max distance between pickup and dropoff for a partial load.

1,000,000 miles (default unconstrained)

Enable Circuitry Limit for Manifest

Enables routing efficiency constraint using Circuitry Ratio.

Yes

Maximum Circuitry Limit Ratio

Max allowed ratio of manifest mileage to straight-line mileage.

1.6

Cost per Mile

Value used by engine to calculate cost of candidate manifests.

$3 / mile

Adhere to Location Operating Hours

If enabled, only selects loads that comply with location time windows.

No

Use Cubic Feet for Volume

If true, uses cubic feet instead of pallet count for volume handling.

Yes


Data Dictionary

Name

Description

Data Type

Trailer Capacity Limits

Max trailer weight, volume and pallets

Number

Default Load Capacity

Fallback weight, volume and pallets for a load

Number

Maximum Days per Manifest

Longest time allowed to complete all stops in a manifest

Integer

Maximum Wait Time at Stops

Longest dwell allowed at a stop (hrs)

Number

Enable Load Count Limit per Manifest

Turn on a hard cap on loads per manifest

Boolean

Maximum Legs per Manifest

Most distinct stops (legs) in one manifest

Integer

Enable Circuitry Limit for Manifest

Turn on the route-vs-straight-line mileage limit

Boolean

Maximum Circuitry Limit Ratio

Highest manifest-to-straight-line mileage ratio

Decimal

Cost per Mile

Cost per mile used to score candidate manifests

Currency

Adhere to Location Operating Hours

Only plan stops inside site operating hours

Boolean

Use Cubic Feet for Volume

Measure volume in cubic feet instead of pallet count

Boolean

Maximize Consolidated Loads

Favor more loads per manifest over lower cost (Partial only)

Boolean

Maximum Partial Loads per Manifest

Most partial loads in one manifest (Partial only)

Integer

Enable Partial Load's Stop Count Limit per Manifest

Turn on a limit on distinct stops (Partial only)

Boolean

Minimum Distance Savings for Load Combination

Miles a combination must save to be worth making (Partial only)

Number

Maximum Distance Ratio for Load Combination

Highest ratio of combined miles to direct miles (Partial only)

Decimal

Pickup & Delivery Proximity

Maximum distance between a partial load's pickup and delivery (Partial only)

Number